Markets > Palomino HPP

  • Installed Capacity: 80 MW
  • Location: Yaque del Sur and Del Medio River | Dominican Republic
  • Scope of Services: Line Transmission Front end engineering designs, Front end engineering design Consolidation, Civil, Electrical, Mechanical Detailed Engineering Design, Telecommunication Project, Resident Civil Engineering Service, Interface Coordination, Plant Maintenance and Operational Manuals Preparation Coordination
  • Owner: CDEEE – Corporación Dominicana de Empresas Elétricas Estatales
  • Construction Period: 2006 to 2011
  • Gross Head: 337.50 m
  • Turbines: Francis
  • Powerhouse: Underground excavation Rockfill
  • Main Dam Type: Roller Compacted Concrete
  • Maximum Height of Main Dam: 65 m
  • Type of Spillway: Free Border
  • Discharge Capacity of Spillway: 5,360 m³/s