CHALLENGE
Intertechne carried out the Detailed Desing for interconnections of the New Propylene Recovery Unit (URP) with the existing facilities for Braskem DCX’s PP5 Unit.
Intertechne carried out the Detailed Desing for interconnections of the New Propylene Recovery Unit (URP) with the existing facilities for Braskem DCX’s PP5 Unit.
Todos os direitos reservados Intertechne Consultores 2022 e Desenvolvido por Manalais