CHALLENGE
Located on Tocantins River, the Estreito HPP was inaugurated in 2011, with an installed capacity of 1,087 MW. With a run-of-river reservoir with a capacity of 555 km², the plant has the capacity to supply the demand for electricity in a city with 4 million inhabitants.
For this work, Intertechne carried out the complete basic and civil executive designs. The hydroelectric power plant has 8 generating turbines, a spillway with 14 floodgates and a 480 m dam.