CHALLENGE
With the basic and executive designs developed by Intertehne, Itapebi HPP has an installed capacity of 450 MW, ensuring a total generation of 1.88 million MWh/year of energy.
The hydroelectric power plant is located on the Jequitinhonha River, on the border of the states of Bahia and Minas Gerais.