• ITAPEBI HPP

CHALLENGE

With the basic and executive designs developed by Intertehne, Itapebi HPP has an installed capacity of 450 MW, ensuring a total generation of 1.88 million MWh/year of energy.

The hydroelectric power plant is located on the Jequitinhonha River, on the border of the states of Bahia and Minas Gerais.

DESCRIPTION

CLIENT
Itapebi Geração de Energia / Grupo Neoenergia
CATEGORY
Hydroelectric Power Plant
PLACE
Bahia
Year
1999 to 2003
INSTALLED POWER
450 MW
Interested in our services?

KNOW OUR WORKS

Todos os direitos reservados Intertechne Consultores 2022 e Desenvolvido por Manalais