• MODERNIZATION OF SOLTEIRA AND JUPIÁ ISLAND HPPs

CHALLENGE

Intertechne, a consultative engineering company, in collaboration with CTG Brasil – China Three Gorges Corporation (owner of the plant concession), GE and SEPCO-1, is responsible for the largest hydroelectric plants´s dam modernization design in the country, at Ilha Solteira and Jupiá HPPs.

Inaugurated in the late 60s and early 70s, Jupiá HPPs with installed capacity of 1,551 MW and Ilha Solteira with installed capacity of 3,444 MW, both located on the Paraná River, are undergoing renovations and equipment changes, due to the its operating time. According to Paulo Akashi, director of business development at Intertechne, the objective of the modernization project is to bring more efficiency in energy production. The activities in the so-called Lot 2 started in May 2018.

Intertechne was responsible for the entire design of Electrical Installations, Fire Hydrant Systems, Protection System, Hydromechanics, as well as all the integration, physical interface and electrical interconnections of the generating units and electromechanical auxiliary services belonging to Lot 2 of this modernization plan. In addition to Field Assistance services for both plants and all material management work (cables, cable routes, lighting) up to the connection design on the final equipment. More than 200 km of cables.

DESCRIPTION

CLIENT
CTG Brasil
CATEGORY
Oil & Gas
PLACE
São Paulo - BR
Year
2018 to 2020
INSTALLED POWER
4,990 MW
MATERIAL GENERATION
200 km of cables