CHALLENGE

Certified in accordance with ISO 9001 and 14001 and OHSAS 18001 management standards, São Salvador HPP is located on the Tocantins River and has an installed capacity of 243.2 MW. São Salvador has the capacity to supply energy to 1 million people.

Intertechne was responsible for preparing the basic and executive designs, in addition to providing technical assistance to the work.

DESCRIPTION

CLIENT
CESTE Companhia Energética São Salvador (Tractebel Energia S.A.)
CATEGORY
Hydroelectric Power Plant
PLACE
Tocantins
Year
2006 to 2009
INSTALLED POWER
243,2 MW