PROJECT CONSULTING

Are you interested in our services?

BIM Intertechne

We believe that a quality work is the result of an excellent project. For this reason, our engineers work focused on thoroughly analyzing all the variables that may impact on the quality, delivery schedule and cost reduction of a project. This religious zeal that we have with each new project translates into more sustainable, safe and economical works.

Feasibility studies and inventory
Feasibility studies and inventory
The initial phases of studies of hydroelectric potentials are fundamental in the design of future projects. In these phases the best resources are allocated, all available intelligence. This is how we do it at Intertechne, without a well-designed start, any subsequent study will suffer.
Projects (conceptual, basic and executive)
Projects (conceptual, basic and executive)
Conceiving, specifying and detailing have an important intrinsic relationship. The final product, which is the completed work or plant, will be better planned, built and/or assembled, whenever the conceptual, basic and executive projects have been thought of as a single set. Deficient conceptual or basic projects, strongly affect the executive stage and all its planning. At Intertechne, the rule is to conceive and design, always respecting the assets’ constructability, assembly and operating characteristics, prioritizing safety and sustainability.
Due Diligence
Due Diligence
Evaluating Green or Brownfield assets requires experience and agility. Intertechne’s technical staff is qualified to carry out the necessary evaluations in a Due Diligence process in all the specialties involved. Having a comprehensive staff of professionals from different engineering specialties is our differential.
Environmental Impact Studies (EIA)
Environmental Impact Studies (EIA)
The multiple specialties involved in an Environmental Impact Study make it difficult to maintain a permanent staff of specialists. Intertechne has coordinators specialized in the environmental area, with a strong capacity to mobilize specialists. We have the best specialists in the areas of Physical and Biotic Environment, EExibindo resultados para socioeconomicEm vez disso, pesquisar por socioeconomyResultados da pesquisaResultados da WebSocioeconomics, Social Communication, and other disciplines necessary for the proper treatment of the environmental issue.
Dam Safety Plan and Emergency Action Plan
Dam Safety Plan and Emergency Action Plan
Intertechne has been responsible for several contracts in the area of dam safety, with a view to complying with legislation and safety standards, disseminating good practices and keeping them in good operating conditions.

The Dam Safety Plan (PSB) structures the main data and documents of a Hydroelectric Power Plant, standardizing maintenance and inspection procedures and records. Depending on the characteristics of the project, it may also contain the Emergency Action Plan (PAE), which, based on risk analysis and hypothetical studies of dam rupture, specifies the actions to be implemented in cases of anomalies identification and alerts.

Intertechne developed the Dam Safety Plan and the Emergency Action Plan for Tucuruí HPP (one of the largest spillways in the world, according to ICOLD) and for Ilha Solteira and Jupiá HPPs. We also conducted more than sixty safety audits on water supply dams, among other similar contracts, which resulted in the continuous improvement of our expertise in the Dam Safety area. In addition, it is responsible for the Periodic Review of Dam Safety (RPSB) of Serra da Mesa HPP, Furnas HPP, Capim Branco I and II HPPs, Luiz Carlos Barreto de Carvalho HPP, Mascarenhas de Moraes HPP, Corumbá I HPP, Itumbiara HPP, as well as 10 other hydroelectric power plants and 8 multipurpose dams in Brazil. At the moment, Intertechne is finalizing the safety assessment of more than thirty dams under a contract with BRK Ambiental in Brazil, and also 8 other dams under a contract with CODEVASF. Among its clients are companies such as Eletronorte, Furnas, Eletrosul, Vale, Cemig, CODEVASF, CTG, EDP, BRK Ambiental, Votorantim Energia and GERDAU.

Modernization of HPPs
Modernization of HPPs
Most of the main HPPs in operation in the world have been in operation for over 30 years. Although a hydroelectric power plant can generate energy indefinitely, in order to keep these plants in operation, operating safely and guaranteeing the necessary energy for society, in addition to regular inspection and maintenance procedures, constant modernization of its equipment is essential. With the aging of equipment, the downtime increases, maintenance becomes more expensive and time-consuming and equipment is discontinued, replaced by new technologies, which hinders the replacement of components.

The objective of modernization is always continuous improvement, through the optimization of resources, with innovative solutions minimizing adverse social and environmental impacts. Plant rehabilitation works show particular challenges, such as not interrupting the operation of the generating units, or minimizing the downtime of the modernizing generating units, aiming at greater efficiency in energy production.

The modernization strategy takes into account the risks, costs and performance of each renewal option, including analysis of the plant’s historical operation, maintenance data, project data, on-site surveys and energy market analysis.

Intertechne has considerable experience in rehabilitating hydroelectric power plants and is currently responsible for the largest hydroelectric power plants modernization project in the country, at the HPPs of Ilha Solteira (3,444 MW) and Jupiá (1,551 MW), located on the Paraná River.