CHALLENGE
Angola’s largest energy producer, with an installed capacity of 2,067 MW, was built on the Kwanza River, and had the basic, executive and environmental feasibility studies and designs carried out by Intertechne for the client GAMEK (Middle Kwanza Development Office).
The Hydroelectric Power Plant, built between 2012 and 2018, is located in the municipality of Cacuso, in Malanje, being responsible for supplying 45% of Angola’s energy demand, and for the 94% drop in blackouts in the country.