• EL CAJÓN HPP

CHALLENGE

For the project of the second largest hydroelectric plant in Mexico, Intertechne prepared the basic and executive designs for civil works including substation, auxiliary buildings and resident engineering services (in consortium).

El Cajón HPP was built on the Santiago River between 2003 and 2007 and has an installed capacity of 750 MW. After its opening, it was responsible for the 8% increase in the country’s electric power production.

DESCRIPTION

CLIENT
CFE – Comisión Federal de Eletricidad
CATEGORY
Hydroelectric Power Plant
PLACE
Nayarit - Mexico
Year
2018 to 2022
INSTALLED POWER
750 MW
AWARD
Milestone Concrete Face Rockfill Dam Project