• ITAPEBI HPP

CHALLENGE

With the basic and executive designs developed by Intertehne, Itapebi HPP has an installed capacity of 450 MW, ensuring a total generation of 1.88 million MWh/year of energy.

The hydroelectric power plant is located on the Jequitinhonha River, on the border of the states of Bahia and Minas Gerais.

DESCRIPTION

CLIENT
Itapebi Geração de Energia / Grupo Neoenergia
CATEGORY
Hydroelectric Power Plant
PLACE
Bahia
Year
1999 to 2003
INSTALLED POWER
450 MW
Se interessou pelos nossos serviços?

KNOW OUR WORKS

 

Todos os direitos reservados Intertechne Consultores 2020 e Desenvolvido por Manalais