CHALLENGE
Tamboril sph was built between 2017 and 2020, and Intertechne was responsible for preparing the civil and electromechanical designs for this enterprise.
With two Kaplan “S” type turbines, the small hydroelectric plant has an installed capacity of 16 MW. Located on São Bartolomeu River – GO, the SHP has a 6.6 km² reservoir.
The use of BIM technology in the development of the designs was a facilitator, who collaborated a lot in the management of civil and electromechanical interfaces from the initial phases of conception, planning and during the construction and assembly of the work, in addition to constituting a wide database for the asset management in its operation and maintenance.
DESCRIPTION
Interested in our services?
KNOW OUR WORKS