PETROBRÁS – NATURAL GAS TREATMENT AND RECOVERY UNIT – CAMPO DE AZULÃO

SÃO PAULO METRO – PINHEIROS STATION LINE 4

PINTO MARTINS INTERNATIONAL AIRPORT – FORTALEZA

RIO GALEÃO INTERNATIONAL AIRPORT

TELES PIRES HPP

SINOP HPP

SANTO ANTÔNIO HPP

Design Review of construction site containment curtain projects

Design Review and preparation of HIRA Risk and Failure Analysis Studies of the Basic and Detailed Project

Records Engineering (EdR) and carrying out the technical safety audit of the downstream containment structure
